top

The LG CNS Gasan Data Center uses environmentally friendly green IT concepts to provide custom tailored services. The Center is a state of the art facility that meets the most advanced global standards by providing a complete infrastructure for customers.
By using green IDC cooling methods and providing a diversified coolant backup system, the Center can maintain individual temperature and humidity settings for each area. By using outside air for cooling, power costs are reduced, and centralized cooling methods ensure optimum cooling efficiency.

Building outline
  • Construction commenced : 2009
  • Scale : 1 underground floor, 13 above ground floors
  • Site area : 14,946㎡ (4,521 pyeong)
  • Floor area : 75,041㎡ (22,699 pyeong)
  • Machine Room area : 12,060㎡ (3,648 pyeong)
Characteristics
  • Earthquake resistant design : up to 7.0 on the Richter scale
  • Exclusive power supply for both main and reserve power, redundant backup power system
  • Modular/tailored facility environment and green IT solution application
Locations

locations img

Safety

top

Earthquake facilities
  • Resistant to up to 0.2g of seismic acceleration : Richter scale 7.0
Flooding (tsunamis‚ floods)
  • Located in a safe zone away from risk inducing structures
    (Digital City)
  • Located in a flood safe zone (7m above water level)

Power

top

Power supply method

Power supply method img

  • Redundant supply line from Korea Electric Power Corporation
  • Direct connection to the substation forlarge–scale power distribution (exclusive line)
  • Physical separation of incoming lines and pipes
  • Redundant ALTS and MOF high voltage lines
  • Backup high voltage transformers installed
  • Transformer and UPS N+1 methodology
UPS and emergency power generation

UPS and emergency power generation img

  • Redundant exclusive UPS and physically redundant lines
  • Emergency power generator

Cooling

top

A water–cooled air conditioning system designed for energy efficiency has been installed‚ and constant and stable air conditioning is provided through thermo–hygrostats‚ cooling towers‚ redundant main conduits‚ and backup systems

Cooling systems

Cooling systems img

  • Main supply : Cooling tower
  • Backup supply : Emergency distributed cooling source in 8 areas for a distributed vertical conduit system
  • Redundant coolant circulation pump and coolant supply conduits
  • Efficient management of the fan inverter control
Isothermal-humidity system

Isothermal-humidity system img

  • Some of the thermo-hygrostats installed in the computer rooms are designed to admit outdoor air during winter, reducing power consumption for cooling and realizing a green data center.
    • Format : Water–cooled
    • Humidification : Separate humidifiers
    • Backup thermo–hygrostats
Central air
  • Cool and hot zones are separately designated‚ and separate partitions are installed in cool zones to block flow of cool air. This centralized cooling design promotes power saving.
    • Servers separated for each customer(separate cool & hot zones)
    • Grill vents are arranged in cool zones for air conditioning
    • Separate partitions are installed for containment of cool airflow
    • Temperature sensors are installed in cool zones for cooling facilities

Security

top

Building security systems

Building security systems img

  • Bulletproof film on all first floor outside windows
  • Glass damage sensors
  • Fire detection systems (state of the art CCTV)
  • Bollards (posts) installed to prevent unauthorized vehicle entry
Entry⁄exit control system

Entry⁄exit control system img

  • Lobby entry⁄exit control
    • Constant security staff presence and speed gate
    • Lockers to store valuables
  • Entry⁄exit control for the computer room : Interlocking Door (primary biometric recognitionsystem, secondary weight sensor)
  • Integrated security office operations
Vehicle control system

Vehicle control system img

  • Control of incoming cars through security staff
  • Entry⁄exit control through RF Tags
  • Roadblocks (control of cars entering throughthe exits)
  • Operation of elevators exclusively for vehicle drivers